Apply Meter TNB | Mohon Meter Elektrik - SURAYA

We manage TNB electricity meter applications at reasonable prices with no hidden charges. Our concept is APPROVED FIRST, PAY LATER!

Wiring Completed, but TNB Meter Not Yet Applied?

Has the wiring or rewiring work for your house, shop, or factory been completed, but the application for a TNB electricity meter has not yet been submitted?

We manage TNB electricity meter applications at reasonable prices with no hidden charges. Our concept is APPROVED FIRST, PAY LATER!

If you are unsure where and how to apply for a TNB meter, including:

  • New TNB meter application

  • Meter upgrade (1 phase to 3 phase)

  • Additional meter for a new house or additional premises

we are ready to assist in managing the entire process safely, legally, and in accordance with TNB procedures.

Applications are handled by Registered Electrical Contractors with the Energy Commission (ST) & TNB, ensuring a smooth approval process without any technical issues.

Daftar meter TNB surayaDaftar meter TNB suraya

APPLY FOR TNB METER

TNB Meter applications are divided into 2 categories:

Domestic (residential homes)

Commercial (business premises)

Supply Meter TNB terbahagi kepada 2 iaitu :
  • 1 PHASE (230V)
  • 3 PHASE (410V)

There are 2 types of payment charges, which are:

Contractor
  • Form H

  • Form G

  • Electrical Competency Certification

  • TNB Application Management

TNB
  • User Connection Charge (CSP)

  • TNB Meter Deposit

  • Stamp Duty\

    Prices depend on the type of premises and the type of connection.

COST AND PRICE FOR TNB METER INSTALLATION

Harga meter TNB | Electricity meter installation fee list
Harga meter TNB | Electricity meter installation fee list

Kami menyediakan perkhidmatan permohonan meter elektrik TNB untuk rumah dan premis perniagaan secara sah, selamat dan mengikut prosedur TNB.
Urusan dikendalikan oleh kontraktor elektrik berdaftar Suruhanjaya Tenaga, bermula daripada semakan tapak, penyediaan dokumen sehingga meter diluluskan dan dipasang.

daftar meter tnb suraya
daftar meter tnb suraya

βœ… Permohonan Sambungan semula meter TNB ( Existing )

βœ… Permohonan upgrade meter TNB

βœ… Permohonan bekalan baru meter TNB

βœ… Permohonan Meter solar

βœ… permohonan Group Supply / Projek / Perumahan

PERKHIDMATAN PERMOHONAN METER TNB

Kami adalah Kontraktor Elektrik berdaftar dengan TNB, Suruhanjaya Tenaga (ST) dan CIDB yang menyediakan perkhidmatan permohonan meter TNB secara profesional.

Berpengalaman menguruskan permohonan meter TNB untuk rumah, kedai dan pejabat, termasuk bekalan baharu, sambungan semula dan naik taraf meter.

πŸ“² Hubungi atau WhatsApp kami untuk pertanyaan lanjut berkaitan permohonan dan pemasangan meter TNB.

Document yang diperlukan untuk Mohon Meter TNB

DOCUMENT YANG DIPERLUKAN UNTUK MOHON METER BARU
Document apply meter tnb
Document apply meter tnb

Document yang diperlukan untuk mohon meter TNB atas nama INDIVIDU

  • Cadangan Alamat :

  • No tel :

  • Email :

  • location

  • ic pemohon(marking for tnb/ kegunaan tnb)

  • dokumen tanah /geran/carian rasmi/snp/aggremnt/cukai/apa apa yg boleh dijadikan bukti pemilikan

  • bil api jiran terdekat

  • Document boleh bagi dalam bentuk pdf atau gambar , janji jelas

  • Jika staff TNB boleh berikan ID staff untuk dapatkan free deposit

Document yang diperlukan untuk mohon meter TNB Atas nama Syarikat / perniagaan

  • Cadangan Alamat :

  • No tel :

  • Email :

  • location

  • ic wakil (marking for tnb/ kegunaan tnb)

  • dokumen tanah /geran/carian rasmi/snp/aggremnt/cukai/apa apa yg boleh dijadikan bukti pemilikan

  • bil api jiran terdekat

  • SSM dan Perakuan Pendaftaran Akta Pendaftaran Perniagaan 1956 (Borang D) dan Carian Profil Bisnes Terkini oleh SSM atau Permohonan Pendaftaran Untuk Sebuah Syarikat (Seksyen 14) dan Notis Pendaftaran (Seksyen 15);atau Syarikat (Borang 9);

    atau Sijil Pemerbadanan Penukaran Nama Syarikat (Borang 13) dan Pengarah Urusan Syarikat (Borang 49); atau sijil pendaftaran pertubuhan , koperasi atau firma guaman

  • Document boleh bagi dalam bentuk pdf atau gambar , janji jelas

  • Jika staff TNB boleh berikan ID staff untuk dapatkan free deposit

Our Instagram

woman wearing yellow long-sleeved dress under white clouds and blue sky during daytime

Proses mohon meter elektrik sangat mudah dan cepat, tiada caj tersembunyi.

Aminah

Happy customer receiving new electric meter installation at home.
Happy customer receiving new electric meter installation at home.

Perkhidmatan yang sangat memuaskan! Proses permohonan meter elektrik TNB sangat mudah dan cepat. Kontraktor yang dipercayai dan profesional. Sangat berpuas hati!

Faiz

Technician upgrading electric meter to 3-phase at a residential site.
Technician upgrading electric meter to 3-phase at a residential site.
β˜…β˜…β˜…β˜…β˜…
β˜…β˜…β˜…β˜…β˜…

COVER AREA - Seluruh Semenanjung Malaysia

πŸ“ Perlis | πŸ“ Kedah | πŸ“ Pulau Pinang | πŸ“ Perak | πŸ“ Selangor | πŸ“ Negeri Sembilan | πŸ“ Melaka | πŸ“ Johor | πŸ“ Pahang | πŸ“ Terengganu | πŸ“ Kelantan | πŸ“ Wilayah Persekutuan Kuala Lumpur